Potable Water & Fire Water Upgrade
Delivery of a new potable water and fire water infrastructure upgrade to support future site expansion within an operational manufacturing facility.
Solutioneering managed the project from planning through to commissioning, integrating new pumping, reticulation, and automation systems with existing site infrastructure while maintaining operational continuity.
Scope Included
Tie-in to existing potable water storage tanks.
Design and installation of two new potable water pump skids.
Installation of two new pumped supply lines to the production facility.
Fire water network upgrades to support future site expansion.
Automation and control systems integration.
Electrical supply and distribution upgrades.
New pipe bridge and gantry structures.
Commissioning, testing, and operational handover.
The project improved both potable water supply reliability and fire water resilience while providing infrastructure capacity for future site growth.